Our latest audit asked for grind lot tracebacks in 30-minute intervals and magnet/metal detector verification every 2 hours instead of 4, with ATP swab targets ≤100 RLU on pre-op. Are you seeing the same push, and what adjustments to HACCP/SSOPs are working without bottlenecking the bench?
We switched to 30‑min grind lots with time‑coded labels and a simple timer on the grinder scale to trigger label changeovers, and tied the 2‑hour magnet checks to glove‑change breaks so the bench keeps moving. For ATP, we hold to “≤100 RLU pre-op” with 3M Clean‑Trace and only do mid‑shift swabs at high‑risk spots; are you logging magnet verifications or in a quick Google Form? It’s a Pomodoro for HACCP, but throughput’s stayed steady.